• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Structural Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Structural Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Seismic Loss and Downtime Assessment of Existing Tall Steel-Framed Buildings and Strategies for Increased Resilience

    Thumbnail
    View/Open
    44326433.pdf (4.966Mb)
    Date
    2016
    Author
    Carlos Molina Hutt
    Ibrahim Almufti
    Michael Willford
    Gregory Deierlein
    Metadata
    Show full item record
    Abstract
    In areas of high seismicity in the United States, the design of many existing tall buildings followed guidelines that do not provide an explicit understanding of performance during major earthquakes. This paper presents an assessment of the seismic performance of existing tall buildings and strategies for increased resilience for a case study city, San Francisco, where an archetype tall building is designed based on an inventory of the existing tall building stock. A 40-story moment-resisting frame system is selected as a representative tall building. The archetype building is rectangular in plan and represents the state of design and construction practice from the mid-1970s to the mid-1980s. Nonlinear response history analysis (NLRHA) are conducted with ground motions representative of the design earthquake hazard level defined in current building codes, with explicit consideration of near-fault directivity effects. Mean transient interstory drifts and story accelerations under the 10% in 50-year ground motion hazard range from 0.19 to 1.14% and 0.15 to 0.81 g, respectively. In order to influence decision making, performance is reported as the expected consequences in terms of direct economic losses and downtime. Furthermore, to achieve increased levels of resilience, a number of strategies are proposed including seismic improvements to structural and nonstructural systems as well as mitigation measures to minimize impeding factors. Expected direct economic losses for the archetype building are in the order of 34% of building cost and downtime estimates for functional recovery are 87 weeks. The strategies presented in this paper enable up to a 92% reduction in losses and minimize downtime for functional recovery to 1 day or less.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/80268
    Collections
    • Journal of Structural Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV