Show simple item record

dc.contributor.authorW. T. Barlow
dc.contributor.authorD. Brandes
dc.date.accessioned2017-05-08T22:24:23Z
dc.date.available2017-05-08T22:24:23Z
dc.date.copyrightDecember 2015
dc.date.issued2015
dc.identifier.other44251924.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/79892
dc.description.abstractThick-walled concrete orifices are widely used to control outflow rates from stormwater detention basins. There are limited data on stage-discharge relationships for such orifices, particularly for low head and partially full conditions that are relevant to extended detention applications for water quality control. This paper presents laboratory and field testing of stage-discharge relationships for concrete orifices under such conditions. Steady-state and transient drainage curve experiments were conducted in a horizontal flume, and a detention basin with a multistage concrete outlet structure was instrumented to collect drawdown data in the field. For fully submerged conditions, the orifice equation with single-valued discharge coefficient (
dc.publisherAmerican Society of Civil Engineers
dc.titleStage-Discharge Models for Concrete Orifices: Impact on Estimating Detention Basin Drawdown Time
dc.typeJournal Paper
dc.journal.volume141
dc.journal.issue12
dc.journal.titleJournal of Irrigation and Drainage Engineering
dc.identifier.doi10.1061/(ASCE)IR.1943-4774.0000923
dc.treeJournal of Irrigation and Drainage Engineering:;2015:;Volume ( 141 ):;issue: 012
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record