Show simple item record

dc.contributor.authorJunxiao Liu
dc.contributor.authorPeter E. D. Love
dc.contributor.authorBrad Carey
dc.contributor.authorJim Smith
dc.contributor.authorMichael Regan
dc.date.accessioned2017-05-08T22:23:30Z
dc.date.available2017-05-08T22:23:30Z
dc.date.copyrightJune 2015
dc.date.issued2015
dc.identifier.other43911251.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/79441
dc.description.abstractPublic-private partnerships (PPPs) are currently a popular approach for governments to procure social and economic infrastructure. The macroeconomic environment plays a critical role and influences the factors that can lead to the successful delivery of a PPP project. Despite the importance of the macroeconomic environment, limited attention has been paid to ex-ante (that is, before the event, or forecast) evaluation. A review of the normative literature was undertaken, aiming to derive key performance indicators (KPIs) of PPP success. The KPIs were validated by using a vector error correction model. It is suggested that the developed KPIs can be used to evaluate the suitability of the macroeconomic conditions in which a PPP project will be implemented. These KPIs can provide governments and stakeholders with a platform to conduct an effective ex-ante evaluation of PPP projects that will be significant in policy and decision making.
dc.publisherAmerican Society of Civil Engineers
dc.titleEx-Ante Evaluation of Public-Private Partnerships: Macroeconomic Analysis
dc.typeJournal Paper
dc.journal.volume21
dc.journal.issue2
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)IS.1943-555X.0000228
dc.treeJournal of Infrastructure Systems:;2015:;Volume ( 021 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record