Show simple item record

dc.contributor.authorDaniel Reuther
dc.contributor.authorIan Baker
dc.contributor.authorAlexander Yetka
dc.contributor.authorDouglas B. Cleary
dc.contributor.authorWilliam Riddell
dc.date.accessioned2017-05-08T22:19:10Z
dc.date.available2017-05-08T22:19:10Z
dc.date.copyrightSeptember 2014
dc.date.issued2014
dc.identifier.other40717862.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/77450
dc.description.abstractResults from a series of tests intended to study loss of pretension force in bolted assemblies are presented. The test matrix included ASTM A325 assemblies with various direct tension indicators (DTIs), some through-hardened and some not, as well as assemblies without direct tension indicators. Bolt length and diameter and grade of nut were also varied. Load losses were monitored for 42 days (1,000 h). However, load levels generally stabilized after 14 days. Pretension losses were linearly dependent on initial pretension and not affected by DTI or washer configuration. Bolt diameter and length did affect the magnitude of losses over time but not the general linear relationship with initial pretension.
dc.publisherAmerican Society of Civil Engineers
dc.titleRelaxation of ASTM A325 Bolted Assemblies
dc.typeJournal Paper
dc.journal.volume140
dc.journal.issue9
dc.journal.titleJournal of Structural Engineering
dc.identifier.doi10.1061/(ASCE)ST.1943-541X.0000937
dc.treeJournal of Structural Engineering:;2014:;Volume ( 140 ):;issue: 009
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record