Show simple item record

dc.contributor.authorLee F. Hixon
dc.contributor.authorRandel L. Dymond
dc.date.accessioned2017-05-08T22:14:25Z
dc.date.available2017-05-08T22:14:25Z
dc.date.copyrightSeptember 2015
dc.date.issued2015
dc.identifier.other39955927.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/74805
dc.description.abstractA detailed hydrologic/hydraulic model for an urbanized 381-acre watershed in Blacksburg, Virginia, is used to evaluate downstream results from simulation of seven stormwater management (SWM) strategies currently practiced within the United States. Each strategy has unique design criteria for specified design storms and is intended to achieve predevelopment peak runoff rates at the site outfall or a baseline peak runoff rate at a watershed point of interest (POI). Model simulations are run that represent each strategy implemented throughout the watershed within areas currently subjected to SWM. Runoff hydrographs at each site outfall and the watershed POI are evaluated. Evaluation of model results at the site outfalls and a downstream watershed POI lead to a number of observations about the performance of the various strategies and their respective design criteria. Results demonstrate that strategies met the predevelopment peak runoff rate targets for design storms specified in their design criteria at the site outfall. Most strategies did not meet the targets outside of the range of design storms specified in design criteria with the exception of the most frequent storm evaluated when an initial runoff capture and drawdown is required. None of the strategies are found to achieve the baseline peak runoff rates at the watershed POI for a full range of design storms, with almost all strategies failing to meet the baseline target for the more frequent, 1- and 2-year storm events. Strategies that require a watershed analysis to define site-scale design criteria did not perform better, indicating the efforts of a watershed analysis to develop a SWM strategy are not warranted. Results also indicate that as the capture on an initial volume and duration of drawdown increases, additional benefit does not translate downstream.
dc.publisherAmerican Society of Civil Engineers
dc.titleComparison of Stormwater Management Strategies with an Urban Watershed Model
dc.typeJournal Paper
dc.journal.volume20
dc.journal.issue9
dc.journal.titleJournal of Hydrologic Engineering
dc.identifier.doi10.1061/(ASCE)HE.1943-5584.0001099
dc.treeJournal of Hydrologic Engineering:;2015:;Volume ( 020 ):;issue: 009
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record