• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Cost of Right-of-Way Acquisition: Recognizing the Impact of Condemnation via a Switching Regression Model

    Thumbnail
    View/Open
    39940174.pdf (144.8Kb)
    Date
    2014
    Author
    Xiaoxia Xiong
    Kara Kockelman
    Metadata
    Show full item record
    Abstract
    The costs of acquiring parcels by condemnation are usually significantly higher than those of property acquired by negotiation, suggesting that right-of-way (R/W) acquisition costs may best be described by two different regression equations. This paper develops a switching regression model of acquisition cost to simultaneously predict the probability of whether a parcel will go to condemnation rather than be acquired through negotiation and the corresponding acquisition costs under these two regimes. The error terms of the selection equation and the two cost equations follow a trivariate normal distribution to reflect codependence on unobserved factors (such as a land owner’s tenacity or a site’s view value). When applied to the properties acquired across the state of Texas for transportation probjects between 2008 and 2011, the results of this switching regression model suggest that R/W appraisers and staff should pay special attention to parcels in commercial use involving a partial taking with a relatively small remainder and located in more urbanized areas. Comparison of cost estimates between the two regimes (condemnation versus negotiation) suggests that condemned parcels will have, on average, 78% higher acquisition costs and 51% greater price variation across the 1,710 acquired properties. These results suggest that it is much more costly to acquire a property and more difficult to accurately predict its costs if it cannot be acquired through negotiation. The application of model estimates to an example corridor highlights the value of simulation to capture all modeling uncertainties.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/74664
    Collections
    • Journal of Infrastructure Systems

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV