Show simple item record

dc.contributor.authorLiang Chang
dc.contributor.authorFan Peng
dc.contributor.authorYanfeng Ouyang
dc.contributor.authorAmr S. Elnashai
dc.contributor.authorBillie F. Spencer Jr.
dc.date.accessioned2017-05-08T22:13:24Z
dc.date.available2017-05-08T22:13:24Z
dc.date.copyrightDecember 2013
dc.date.issued2013
dc.identifier.other39896189.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/74146
dc.publisherAmerican Society of Civil Engineers
dc.titleErratum for “Bridge Seismic Retrofit Program Planning to Maximize Postearthquake Transportation Network Capacity” by Liang Chang, Fan Peng, Yanfeng Ouyang, Amr S. Elnashai, and Billie F. Spencer Jr.
dc.typeJournal Paper
dc.journal.volume19
dc.journal.issue4
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)IS.1943-555X.0000172
dc.treeJournal of Infrastructure Systems:;2013:;Volume ( 019 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record