• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Impact of Toyota Way Implementation on Performance of Large Chinese Construction Firms

    Thumbnail
    View/Open
    35124117.pdf (266.3Kb)
    Date
    2014
    Author
    Shang Gao
    Sui Pheng Low
    Metadata
    Show full item record
    Abstract
    Many attempts have been made to thoroughly understand the lean approach and its application in construction. Among these efforts, the Toyota way model is viewed as an appropriate approach that pinpoints various aspects of lean, covering long-term philosophy, process, people and partners, and problem solving. Adopting the Toyota way model, this paper investigates the impact of the implementation of Toyota way on the quality and productivity performance of large construction firms in China. Based on the fieldwork involving a questionnaire survey conducted in China, stepwise regression was used to determine which of the Toyota way–style practices lead to predictors of project quality and productivity. This paper provides insights for improving the implementation of the Toyota way in the construction industry. The results show that different practices may affect specific performance measures. Chinese construction firms should therefore prioritize resources and efforts to implement the critical principles identified to enhance performance. For example, if construction firms in China wish to focus on project quality achievement, the critical factors are as follows: be responsible for products, employees, and society (from the philosophy model); the project manager plans the work with input from other parties; reject defective materials, components, and equipment; the workplace follows 5S principles (from the process model); work with partners to improve project effectiveness; take part in partners’ production process (from the people and partner model); and conduct kaizen activities (from the problem-solving model).
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/72450
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV