Show simple item record

dc.contributor.authorHu Qing-mi
dc.contributor.authorHu Zhi-hua
dc.date.accessioned2017-05-08T22:08:54Z
dc.date.available2017-05-08T22:08:54Z
dc.date.copyrightMarch 2014
dc.date.issued2014
dc.identifier.other33755362.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/72318
dc.description.abstractTo cope with the problem that less-than-truckload (LTL) logistics network design for certain origin—destination (OD) flow demands often fails to utilize the network resources in a balanced manner, the characteristics of OD flow uncertainties and network design difficulties are analyzed, and a mixed integer programming model is devised by considering the OD flow uncertainties based on inventory theory. An example study demonstrates that design of a logistics network with OD flow uncertainties based on optimizing the network operation and construction costs, and the network resources utilization ratio comprehensively has a significant improvement in balancing the utilization degree of network resources compared to only considering minimizing the network operation and construction costs. The result contributes to adjustment of the logistics network structure to improve the balancing utilization degree of network resources for uncertain OD flow demands.
dc.publisherAmerican Society of Civil Engineers
dc.titleResource Balancing in the Design of Hub-and-Spoke Network for LTL Logistics
dc.typeJournal Paper
dc.journal.volume8
dc.journal.issue1
dc.journal.titleJournal of Highway and Transportation Research and Development (English Edition)
dc.identifier.doi10.1061/JHTRCQ.0000371
dc.treeJournal of Highway and Transportation Research and Development (English Edition):;2014:;Volume ( 008 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record