• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Audit Contract Provisions and Real-Time Cost Reporting in Construction Contracting

    Thumbnail
    View/Open
    32326862.pdf (62.74Kb)
    Date
    2005
    Author
    Donald D. Wyse
    Saahil Malik
    Metadata
    Show full item record
    Abstract
    With the advent of contracting methods in the construction industry that result in the owner compensating a contractor for “actual costs” as opposed to a lump-sum payment, the owner must protect its interest by taking on the responsibility of confirming amounts actually incurred by the contractor and determining if these amounts are allowable under the terms of the contract. To succeed at such an endeavor, an owner must have a general understanding of contract interpretation, the risk of not incorporating an express audit provision in its contract, and the implications of not implementing a real-time reporting structure. This paper sets forth the benefits of requiring a real-time reporting structure in the owner-contractor agreement.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/72143
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV