Show simple item record

dc.contributor.authorInnocent Basupi
dc.contributor.authorZoran Kapelan
dc.date.accessioned2017-05-08T22:08:07Z
dc.date.available2017-05-08T22:08:07Z
dc.date.copyrightJune 2015
dc.date.issued2015
dc.identifier.other31553366.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/72036
dc.description.abstractPerformance of water distribution systems (WDSs) is highly dependent on consumer water demand that has to be met with adequate pressure. With uncertain future water demand due to the effect of rapid urbanization and climate change, WDSs may underperform or end up being overdesigned because of the long-term unforeseen future conditions. Long-term planning of WDS therefore requires strategic, cost-effective, and sustainable design intervention investment across the entire planning horizon that is uncertain in nature. However, making the most appropriate decisions on such intervention measures that keep up the performance of WDS under uncertainty is a challenge. This paper illustrates the importance of flexible WDS design under uncertain future water demand. The methodology has been tested on the New York Tunnels and the Anytown network interventions in the long-term planning. The approach is compared with the traditional deterministic intervention plans. The analysis results demonstrate that there is potential WDS performance value obtained when flexible design approach is adopted rather than the conventional deterministic practice.
dc.publisherAmerican Society of Civil Engineers
dc.titleEvaluating Flexibility in Water Distribution System Design under Future Demand Uncertainty
dc.typeJournal Paper
dc.journal.volume21
dc.journal.issue2
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)IS.1943-555X.0000199
dc.treeJournal of Infrastructure Systems:;2015:;Volume ( 021 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record