• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Roof Runoff Replenishment of Groundwater in Jinan, China

    Thumbnail
    View/Open
    29558216.pdf (2.782Mb)
    Date
    2015
    Author
    Weiping Wang
    Declan Page
    Yaqun Zhou
    Joanne Vanderzalm
    Peter Dillon
    Metadata
    Show full item record
    Abstract
    In Jinan, China, which is named the Spring City of China, karst groundwater is an important water source for urban supply and maintaining spring flow. However, rapid urbanization in Jinan, China, has caused overexploitation of groundwater and an increase in surface runoff. Consequently, roof runoff harvesting and recycling via the aquifer is being considered to augment the recharge for this area. A pilot-managed aquifer recharge scheme with urban roof runoff was investigated as part of this case study to supplement groundwater recharge. This case study is intended as a pilot for the wider application of managed aquifer recharge at the University of Jinan. The pilot-scale system is composed of the roof catchment, first-flush removal device, regulating tank, filter tank, and recharge well; dimensions and operating parameters of each component were designed by laboratory experiment and hydraulic calculations. The quality of roof runoff is better than road runoff; however, it is still contains a number of hazards. The injected water quality must meet the quality standard for groundwater for the protection of potable groundwater quality. Barriers, or measures to protect water quality, within the treatment train include first-flush removal (first 6 mm rainfall) followed by sedimentation and filtration in a zeolite filter. Water quality monitoring of each barrier and geochemical simulation were used to evaluate the potential influences on groundwater recharge and quality. The rainfall, recharge quantities, and groundwater levels as well as water quality through the recharge process were monitored continuously in June to November 2012. All indexes of treated roof runoff were below the quality standard for groundwater, with the exception of turbidity. Geochemical modeling indicates there is some calcite dissolution after injection but this does not pose a risk to the operational lifetime of the recharge well. However, pretreatment of the source water still needs further improvement to decrease the turbidity to acceptable levels. In addition, water quality risk management is also required for sustainable long-term operation of the scheme.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/71717
    Collections
    • Journal of Hydrologic Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV