Show simple item record

dc.contributor.authorChao Hao
dc.contributor.authorDongling Jia
dc.date.accessioned2017-05-08T22:04:50Z
dc.date.available2017-05-08T22:04:50Z
dc.date.copyrightDecember 2006
dc.date.issued2006
dc.identifier.otherjhtrcq%2E0000144.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/70695
dc.description.abstractThere are many factors which influence the creep of concrete-filled steel tubular arch bridge, while the theory researches lag behind practice. Based on the computing formula of creep coefficient in code, the creep function is formulated. The computing method of creep in structure analysis is deduced, using the integral concept to stress and time. Combined with the calculation of Meixi River Bridge, it is pointed out that creep affects the displacement of CFST arch bridge prominently, which will lead to redistribution of internal force, and it should be recognized by engineering circle.
dc.publisherAmerican Society of Civil Engineers
dc.titleComputation and Analysis of the Creep Effect of Long-span Concrete-filled Steel Tubular Arch Bridge
dc.typeJournal Paper
dc.journal.volume1
dc.journal.issue1
dc.journal.titleJournal of Highway and Transportation Research and Development (English Edition)
dc.identifier.doi10.1061/JHTRCQ.0000144
dc.treeJournal of Highway and Transportation Research and Development (English Edition):;2006:;Volume ( 001 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record