• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Highway and Transportation Research and Development (English Edition)
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Highway and Transportation Research and Development (English Edition)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Global Analysis of the SuTong Cable-stayed Bridge

    Thumbnail
    View/Open
    jhtrcq%2E0000143.pdf (768.3Kb)
    Date
    2006
    Author
    Jiawu Miao
    Minshan Pei
    Xigang Zhang
    Rucheng Xiao
    Metadata
    Show full item record
    Abstract
    The SuTong cable-stayed bridge is the Primary Fairway Bridge of the Suzhou-Nantong Yangtze River Bridge Project. It will be the most important project with significant target to diminish the economy gap and promote balanced development between Suzhou and Nantong city in China. The total length of the cable-stayed portion of this project is 2,088 m with main span of 1,088 m. The height of the pylons is about 300 m. When completed it will be the longest cable-stayed bridge in the world. This paper gives a brief description of the bridge and some considerations on structural design and static analysis.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/70694
    Collections
    • Journal of Highway and Transportation Research and Development (English Edition)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV