Show simple item record

dc.contributor.authorWang Yu-qian
dc.contributor.authorChen Ai-rong
dc.contributor.authorBian Guo-yan
dc.date.accessioned2017-05-08T22:04:40Z
dc.date.available2017-05-08T22:04:40Z
dc.date.copyrightMarch 2013
dc.date.issued2013
dc.identifier.otherjhtrcq%2E0000025.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/70565
dc.description.abstractThis study discusses the objectives of state-level and enterprise-level positions of decision makers in bridge engineering decision problems and their hierarchical structures. Based on the aforementioned factors, cost classification method is established according to economic evaluation techniques, undertakers, and decision makers’ objectives. Social, enterprise, and ecology discount rates are discussed for national economic evaluation, financial evaluation, and environmental cost calculation, respectively. Computation period of cost analysis is discussed for national economic evaluation and financial evaluation. Residual life value of people and compensation are analyzed in order to facilitate the cost calculation related to bridge defect-incurred accidents. Finally, cost and parameter analysis in national economic evaluation and financial evaluation for wind-shielding screen schemes of a particular project is used as an example to illustrate the proposed cost composition and parameter analysis.
dc.publisherAmerican Society of Civil Engineers
dc.titleCost Constitution and Parameter Analysis of Bridge Engineering Computation Period by Considering Concerns of Decision Makers
dc.typeJournal Paper
dc.journal.volume7
dc.journal.issue1
dc.journal.titleJournal of Highway and Transportation Research and Development (English Edition)
dc.identifier.doi10.1061/JHTRCQ.0000025
dc.treeJournal of Highway and Transportation Research and Development (English Edition):;2013:;Volume ( 007 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record