Show simple item record

dc.contributor.authorWilliam J.
dc.contributor.authorTempleton
dc.contributor.authorDavid A.
dc.contributor.authorJay
dc.date.accessioned2017-05-08T22:04:22Z
dc.date.available2017-05-08T22:04:22Z
dc.date.copyrightSeptember 2013
dc.date.issued2013
dc.identifier.other%28asce%29ww%2E1943-5460%2E0000236.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/70471
dc.description.abstractLong-term changes in the sand balance of a river-estuary system can strongly affect navigation and ecosystems. Here, we examine two sand budget components in the lower Columbia tidal river, fluvial supply and human removal. Rating curves were used to estimate daily sand input between 1900 and 2010. Publications, interviews, and data analyses were used to evaluate sand removal by dredging and mining. Comparison between sand input and removal indicates that a sand deficit has existed for
dc.publisherAmerican Society of Civil Engineers
dc.titleLower Columbia River Sand Supply and Removal: Estimates of Two Sand Budget Components
dc.typeJournal Paper
dc.journal.volume139
dc.journal.issue5
dc.journal.titleJournal of Waterway, Port, Coastal, and Ocean Engineering
dc.identifier.doi10.1061/(ASCE)WW.1943-5460.0000188
dc.treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;2013:;Volume ( 139 ):;issue: 005
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record