| dc.contributor.author | Teng Huang | |
| dc.contributor.author | Guihua Li | |
| dc.contributor.author | Hongyu Chen | |
| dc.contributor.author | Minwei Jiang | |
| dc.date.accessioned | 2017-05-08T22:01:13Z | |
| dc.date.available | 2017-05-08T22:01:13Z | |
| dc.date.copyright | February 2010 | |
| dc.date.issued | 2010 | |
| dc.identifier.other | %28asce%29su%2E1943-5428%2E0000059.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl/handle/yetl/68891 | |
| dc.description.abstract | The third Nanjing Yangtze River Bridge is a steel pylon cable stayed bridge. Such a structure is new in China and therefore brings new challenges to the work of control surveys. This paper describes the survey methods used for building and erecting the steel pylons and for construction of the steel tower. The survey methods adopted have proven successful and can be used as reference for similar projects in the future. | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Precise Control Survey for Erecting the Steel Pylons of the Third Nanjing Yangtze River Bridge, China: Case Study | |
| dc.type | Journal Paper | |
| dc.journal.volume | 136 | |
| dc.journal.issue | 1 | |
| dc.journal.title | Journal of Surveying Engineering | |
| dc.identifier.doi | 10.1061/(ASCE)SU.1943-5428.0000012 | |
| dc.tree | Journal of Surveying Engineering:;2010:;Volume ( 136 ):;issue: 001 | |
| dc.contenttype | Fulltext | |