Show simple item record

dc.contributor.authorTeng Huang
dc.contributor.authorGuihua Li
dc.contributor.authorHongyu Chen
dc.contributor.authorMinwei Jiang
dc.date.accessioned2017-05-08T22:01:13Z
dc.date.available2017-05-08T22:01:13Z
dc.date.copyrightFebruary 2010
dc.date.issued2010
dc.identifier.other%28asce%29su%2E1943-5428%2E0000059.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/68891
dc.description.abstractThe third Nanjing Yangtze River Bridge is a steel pylon cable stayed bridge. Such a structure is new in China and therefore brings new challenges to the work of control surveys. This paper describes the survey methods used for building and erecting the steel pylons and for construction of the steel tower. The survey methods adopted have proven successful and can be used as reference for similar projects in the future.
dc.publisherAmerican Society of Civil Engineers
dc.titlePrecise Control Survey for Erecting the Steel Pylons of the Third Nanjing Yangtze River Bridge, China: Case Study
dc.typeJournal Paper
dc.journal.volume136
dc.journal.issue1
dc.journal.titleJournal of Surveying Engineering
dc.identifier.doi10.1061/(ASCE)SU.1943-5428.0000012
dc.treeJournal of Surveying Engineering:;2010:;Volume ( 136 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record