• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Natural Hazards Review
    • View Item
    •   DSpace Home
    • ASCE
    • Natural Hazards Review
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Multiphase Risk-Management Method and Its Application in Tunnel Engineering

    Thumbnail
    View/Open
    %28asce%29nm%2E2153-5477%2E0000059.pdf (1.040Mb)
    Date
    2014
    Author
    Yun
    Bai
    Zhiren
    Dai
    Weijie
    Zhu
    Metadata
    Show full item record
    Abstract
    For a better understanding of risk management and the optimization of risk mitigation, a multiphase risk-management method is proposed in which the assessment of risks is divided into two phases: the initial risk phase and the secondary risk phase. The initial risk phase is used for risk evaluation at the beginning of a project and can be quantified by the combination of probability and loss. If the initial risk is not acceptable, risk-mitigation measures are evaluated and the most appropriate measure will be adopted. The secondary risk phase involves identifying risks after implementing the selected mitigation measures for the initial risk, and the mitigation costs are also included. Obviously, the secondary risk must be lower than the initial risk. The task of a tunnel engineer is to select mitigation measures that result in the lowest secondary risk. During project execution, environmental factors may change, and deviations from the original design assumptions may take place. These phenomena have a knock-on effect on the risk profile, and a timely reevaluation of the risk scenario becomes necessary. Therefore, it is further proposed that the two-phase risk-evaluation process be extended to infinite phases. The novelty of the proposed method is characterized by its combination of a dynamic risk-management system and a timely reassessment of new risks, and the continuous tracking of risks until they are negligible. Finally, a relevant example of risk management using the proposed method is illustrated, in which the most appropriate and economical risk management was achieved, and the established objectives of the construction quality and timeline were ensured. This multiphase risk-management approach can be applied to tunnel engineering as well as other engineering fields.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/67522
    Collections
    • Natural Hazards Review

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV