Show simple item record

dc.contributor.authorTanaphat Jeerangsuwan
dc.contributor.authorHisham Said
dc.contributor.authorAmr Kandil
dc.contributor.authorSatish Ukkusuri
dc.date.accessioned2017-05-08T21:53:57Z
dc.date.available2017-05-08T21:53:57Z
dc.date.copyrightSeptember 2014
dc.date.issued2014
dc.identifier.other%28asce%29la%2E1943-4170%2E0000031.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/65767
dc.description.abstractThe rapid increase in both financial demands and the need for large and comprehensive highway infrastructure systems necessitates public authorities to muster support from the private sector. Public-private partnerships (PPP) have been increasingly adopted and cited as one of the most effective project delivery systems, which bring balance to risks and rewards between involved project participants. However, a number of PPP infrastructure projects around the world have been reported to have operating deficits and difficulties in debt-servicing. One of the major reasons for these difficulties is the unrealistic and inaccurate prediction of project investment performance during the initial stages of project viability and profitability analysis. Therefore, the research reported in this paper presents a formulation of a comprehensive framework that evaluates financial viability of PPP toll road projects. The framework utilizes a modified user-equilibrium traffic-assignment algorithm to estimate toll road traffic volume considering critical demand-influencing factors, which include travel time, pavement serviceability, and out-of-pocket user trip expenses. The proposed framework also considers the effects of the rehabilitation maintenance activities on the equilibrium flow pattern and project financial viability. This makes possible an estimation of the maintenance costs and frequency as well as an evaluation of the effects of rehabilitation programs on the traffic volume. The research reported in this paper also demonstrates the difference in traffic-flow patterns with and without interactive changes in pavement performance and traffic volume to demonstrate the need for incorporation of pavement performance and network levels of service into PPP highway project evaluation.
dc.publisherAmerican Society of Civil Engineers
dc.titleFinancial Evaluation for Toll Road Projects Considering Traffic Volume and Serviceability Interactions
dc.typeJournal Paper
dc.journal.volume20
dc.journal.issue3
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)IS.1943-555X.0000175
dc.treeJournal of Infrastructure Systems:;2014:;Volume ( 020 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record