Show simple item record

dc.contributor.authorAli Almassi
dc.contributor.authorBrenda McCabe
dc.contributor.authorMatthew Thompson
dc.date.accessioned2017-05-08T21:53:50Z
dc.date.available2017-05-08T21:53:50Z
dc.date.copyrightJune 2013
dc.date.issued2013
dc.identifier.other%28asce%29is%2E1943-555x%2E0000145.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/65705
dc.description.abstractA fast and computationally efficient valuation tool assists governments involved in Public–Private Partnership (P3) projects to examine many contractual configurations and design a guarantee that minimizes cost and reasonably mitigates the risk. This paper presents a continuous stochastic process derived from the risk factor forecast, thereby providing a more realistic and flexible model. A new valuation approach is developed by using a finite-difference method based on this continuous stochastic process. In a numerical example with one risk factor, it is shown that this new valuation tool is 100 times faster than the existing simulation-based approach. Its superior speed presents the opportunity to examine different contractual configurations, and as a result, design a more cost effective guarantee contract. Exercise strategies are derived for a multiple-exercise (Australian) guarantees structure. This new approach can be used by a government to reserve budget for the guarantees. Finally, the continuous underlying random process and exercise strategy enable this method to value more complex guarantee structures.
dc.publisherAmerican Society of Civil Engineers
dc.titleReal Options–Based Approach for Valuation of Government Guarantees in Public–Private Partnerships
dc.typeJournal Paper
dc.journal.volume19
dc.journal.issue2
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)IS.1943-555X.0000117
dc.treeJournal of Infrastructure Systems:;2013:;Volume ( 019 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record