Show simple item record

dc.contributor.authorJ. R. Williams
dc.contributor.authorN. Kannan
dc.contributor.authorX. Wang
dc.contributor.authorC. Santhi
dc.contributor.authorJ. G. Arnold
dc.date.accessioned2017-05-08T21:49:17Z
dc.date.available2017-05-08T21:49:17Z
dc.date.copyrightNovember 2012
dc.date.issued2012
dc.identifier.other%28asce%29he%2E1943-5584%2E0000549.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/63417
dc.description.abstractThe Natural Resources Conservation Service (NRCS) [previously Soil Conservation Service (SCS)] developed the SCS runoff curve-number (CN) method for estimating direct runoff from storm rainfall. The NRCS uses the CN method for designing structures and for evaluating their effectiveness. Structural design is usually based on a single event of a certain probability of occurrence. During the years when many floodwater-retarding watershed projects were planned and constructed (1950–1980), the CN equation was used in a continuous mode to evaluate the projects. To operate CN in a continuous mode, runoff was estimated from a daily rainfall record of approximately 30 years. For each day of recorded rainfall, the five-day antecedent rainfall was used to assign a
dc.publisherAmerican Society of Civil Engineers
dc.titleEvolution of the SCS Runoff Curve Number Method and Its Application to Continuous Runoff Simulation
dc.typeJournal Paper
dc.journal.volume17
dc.journal.issue11
dc.journal.titleJournal of Hydrologic Engineering
dc.identifier.doi10.1061/(ASCE)HE.1943-5584.0000529
dc.treeJournal of Hydrologic Engineering:;2012:;Volume ( 017 ):;issue: 011
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record