Show simple item record

dc.contributor.authorAbebe S. Gebregiorgis
dc.contributor.authorFaisal Hossain
dc.date.accessioned2017-05-08T21:49:04Z
dc.date.available2017-05-08T21:49:04Z
dc.date.copyrightJanuary 2012
dc.date.issued2012
dc.identifier.other%28asce%29he%2E1943-5584%2E0000431.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/63289
dc.description.abstractThis case study presents a risk analysis reassessment for the oldest dam in the Tennessee River basin—the Wilson Dam—based on postdam flow data. The hydrologic risk of old Wilson Dam was computed from historical flow data (spanning pre and postdam periods) and reservoir volume at the dam site. Additional flow data not previously used in the design phase of the dam helped to update more robustly the probability of flood occurrence that exceeded a particular return period during the life of a dam. The generalized extreme value (GEV) distribution was fitted to historical peak flow (at the dam site) and annual maximum reservoir volume using the
dc.publisherAmerican Society of Civil Engineers
dc.titleHydrological Risk Assessment of Old Dams: Case Study on Wilson Dam of Tennessee River Basin
dc.typeJournal Paper
dc.journal.volume17
dc.journal.issue1
dc.journal.titleJournal of Hydrologic Engineering
dc.identifier.doi10.1061/(ASCE)HE.1943-5584.0000410
dc.treeJournal of Hydrologic Engineering:;2012:;Volume ( 017 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record