• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Selecting Flow Frequency Distributions for Designing a Small Low-Head Dam Removal Cofferdam

    Thumbnail
    View/Open
    %28asce%29he%2E1943-5584%2E0000111.pdf (1.605Mb)
    Date
    2009
    Author
    Liaqat A. Khan
    Metadata
    Show full item record
    Abstract
    One of the first steps in removing a dam is the construction of a cofferdam so that demolition activities can proceed safely. The time necessary for removing a small low-head dam is often on the order of a few months. To minimize the cofferdam construction cost, these dams are generally removed during the low flow months of the year. Therefore, design of cofferdams should be based on river flow series during the dam removal period, rather than the entire year. In this study, available hourly and daily average records at the recently removed Marmot Dam on the Sandy River, Oregon are analyzed for four dam removal periods, varying from 1 to 4 months (July through October).
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/62957
    Collections
    • Journal of Hydrologic Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV