Show simple item record

dc.contributor.authorJie Han
dc.contributor.authorAnil Bhandari
dc.contributor.authorFei Wang
dc.date.accessioned2017-05-08T21:45:14Z
dc.date.available2017-05-08T21:45:14Z
dc.date.copyrightAugust 2012
dc.date.issued2012
dc.identifier.other%28asce%29gm%2E1943-5622%2E0000062.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/61445
dc.description.abstractThe geosynthetic-reinforced pile-supported embankment is one of the favorable ground improvement techniques used in the construction of earth structures over a compressible soil when limited construction time is available and limited deformation is permissible. Various methods are available for the design of the geosynthetic-reinforced platform based on various load transfer mechanisms from the embankment to the piles and the compressible soil. The existence of the geosynthetic layer makes the mechanisms more complex. This study focuses on the behavior of geogrid-reinforced embankments over piles compared with the behavior of unreinforced embankments. The numerical simulations of the unreinforced and reinforced pile-supported embankments were conducted using the discrete element method (DEM). The embankment fill was simulated using unbonded graded aggregates of diameters ranging from 9.2 to 20.8 mm and the geogrid was simulated using bonded particles. This study investigated the changes of vertical and horizontal stresses and porosities, the vertical displacements within the embankment fill, and the deflection and tension in the geogrid. The simulation results showed that the coefficient of lateral earth pressure in the embankment fill changed from an initial at rest condition to a passive condition at certain locations after the compression of the compressible soil. The embankment fill dilated during the development of soil arching. The embankment load was transferred to the piles owing to the reorientation of the principal stresses. The results also showed that the geogrid reinforcement significantly reduced the total and differential settlements at the top of the embankment.
dc.publisherAmerican Society of Civil Engineers
dc.titleDEM Analysis of Stresses and Deformations of Geogrid-Reinforced Embankments over Piles
dc.typeJournal Paper
dc.journal.volume12
dc.journal.issue4
dc.journal.titleInternational Journal of Geomechanics
dc.identifier.doi10.1061/(ASCE)GM.1943-5622.0000050
dc.treeInternational Journal of Geomechanics:;2012:;Volume ( 012 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record