Effective Repair for Corrosion Control Using FRP Wraps
Abstract
This paper presents results from a multiyear study to evaluate the role of prewrap substrate preparation on corrosion mitigation in a marine environment. Seventeen one-third scale prestressed piles were corroded to 20% metal loss to simulate severe corrosion. Subsequently, two types of prewrap substrate preparation were carried out: (1) full repair in which the delaminated concrete was removed and the section reformed and (2) epoxy injection repair in which the cracks were sealed and the surface cleaned. Specimens were then wrapped using carbon fiber-reinforced polymer (CFRP) and exposed to simulated tidal cycles at