Show simple item record

dc.contributor.authorAbdulaziz M. Jarkas
dc.date.accessioned2017-05-08T21:33:27Z
dc.date.available2017-05-08T21:33:27Z
dc.date.copyrightMarch 2012
dc.date.issued2012
dc.identifier.other%28asce%29ae%2E1943-5568%2E0000043.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/56045
dc.description.abstractBuildability is one of the most important factors influencing labor productivity. However, an extensive search of the literature revealed a dearth of research into its effects on labor productivity of in situ reinforced concrete construction, especially on the activity levels. Rebar installation is an integral, labor-intensive trade of this type of construction material. Its walls form major parts of reinforced concrete frames, which are typically associated with a higher unit rate cost compared with other structural elements, especially spread foundations and grade and one-way elevated slabs. Therefore, objective of this research is to investigate the effects and relative influence of the rebar diameter, quantity of reinforcement installed, wall thickness, plan geometry, and wall curvature intensity, on rebar installation labor productivity of walls. To achieve this objective, a sufficiently large volume of installation labor productivity data was collected and analyzed using the multiple categorical-regression method. The results obtained show a significant influence of factors investigated on the labor efficiency of the installation operation, which can be used to provide designers feedback on how well their designs consider the requirements of the buildability concept, and the tangible consequences of their decisions on labor productivity. In addition, a set of recommendations are presented, which on implementation, can improve the buildability level of this activity, hence translating into higher labor efficiency and lower labor cost. Moreover, the depicted patterns of factors explored may provide guidance to construction managers for effective activity planning and efficient labor utilization.
dc.publisherAmerican Society of Civil Engineers
dc.titleAnalysis and Measurement of Buildability Factors Influencing Rebar Installation Labor Productivity of In Situ Reinforced Concrete Walls
dc.typeJournal Paper
dc.journal.volume18
dc.journal.issue1
dc.journal.titleJournal of Architectural Engineering
dc.identifier.doi10.1061/(ASCE)AE.1943-5568.0000043
dc.treeJournal of Architectural Engineering:;2012:;Volume ( 018 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record