Show simple item record

dc.contributor.authorWilliam M. Hayden Jr.
dc.date.accessioned2017-05-08T21:32:24Z
dc.date.available2017-05-08T21:32:24Z
dc.date.copyrightJanuary 2006
dc.date.issued2006
dc.identifier.other%28asce%291532-6748%282006%296%3A1%281%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/55385
dc.description.abstractThis paper was derived from research I conducted at three professional design engineering service firms concerning their perceptions of the “sudden” surfacing of conflict within a project team. The data collection methods included confidential one-on-one employee interviews, employee surveys, interviews with the firms’ clients, and feedback from subconsultants (suppliers) to the firms. A review of workplace conflict literature within the design and construction industry, and also in other workplace settings, was compared to proprietary data from management assessment reports of the three firms. This second part of the trilogy will present practical conflict “navigational” guides, including project team assessment for constructive versus destructive conflict, theoretical basis and practical application of Lewin’s force field analysis, three universal metrics of project success, brief anatomies of project failures, an estimate of the cost of unresolved conflict, and a proactive risk assessment checklist.
dc.publisherAmerican Society of Civil Engineers
dc.titleHuman Systems Engineering™— A Trilogy, Part II: May The Force Be With You: Anatomy Of Project Failures
dc.typeJournal Paper
dc.journal.volume6
dc.journal.issue1
dc.journal.titleLeadership and Management in Engineering
dc.identifier.doi10.1061/(ASCE)1532-6748(2006)6:1(1)
dc.treeLeadership and Management in Engineering:;2006:;Volume ( 006 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record