• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Environmental Impacts to Design/Build Projects— A Case Study of the St. George Island Bridge Replacement, Apalachicola Bay, Florida

    Thumbnail
    View/Open
    %28asce%291532-6748%282003%293%3A3%28128%29.pdf (245.2Kb)
    Date
    2003
    Author
    Jeffrey P. Toussant
    Metadata
    Show full item record
    Abstract
    The additional environmental considerations that arise for contractors on design/build projects are discussed, with attention given to the perspectives of the owner and the contractor. The factors that made this particular project suitable for design/build are then described, as are the criteria used in the selection process. The steps taken by the Boh Bros./Sverdrup team to minimize the effect on the sensitive marine environment are recounted, and the way in which certain design elements aided in this effort is discussed. The importance of detailed consultations with all the parties affected by the project is stressed.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/55339
    Collections
    • Leadership and Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV