Show simple item record

dc.contributor.authorNathan Pingel
dc.contributor.authorChristy Jones
dc.contributor.authorDavid Ford
dc.date.accessioned2017-05-08T21:31:27Z
dc.date.available2017-05-08T21:31:27Z
dc.date.copyrightMay 2005
dc.date.issued2005
dc.identifier.other%28asce%291527-6988%282005%296%3A2%2860%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/54767
dc.description.abstractFlood warning systems (FWS), if properly designed and operated, reduce flood damages and save lives. For federally funded projects, the economic benefit of the FWS must be computed. That benefit must be greater than the project cost for the system to be implemented. The driving factor in the benefit computations is the duration of the lead time attributed to the FWS. In other words, how far in advance can a FWS forecast a threshold exceedence? We have developed a straightforward procedure to answer this question using standard-of-practice rainfall-runoff models. The result can be used with economic models to estimate the economic benefit of an FWS for project planning purposes.
dc.publisherAmerican Society of Civil Engineers
dc.titleEstimating Forecast Lead Time
dc.typeJournal Paper
dc.journal.volume6
dc.journal.issue2
dc.journal.titleNatural Hazards Review
dc.identifier.doi10.1061/(ASCE)1527-6988(2005)6:2(60)
dc.treeNatural Hazards Review:;2005:;Volume ( 006 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record