Show simple item record

dc.contributor.authorJim W. Hall
dc.contributor.authorIan C. Meadowcroft
dc.contributor.authorPaul B. Sayers
dc.contributor.authorMervyn E. Bramley
dc.date.accessioned2017-05-08T21:31:21Z
dc.date.available2017-05-08T21:31:21Z
dc.date.copyrightAugust 2003
dc.date.issued2003
dc.identifier.other%28asce%291527-6988%282003%294%3A3%28126%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/54710
dc.description.abstractThe flooding system includes the physical process of flooding, the inhabitants of floodplains, their infrastructures and ecosystems, and the people and organizations in the public and private sector that influence or are subject to flooding and its impacts. Flooding systems are continuously changing because of natural and socioeconomic processes, as well as activities that are intended to reduce flood risk. Flood risk management is the process of data and information gathering, risk assessment, appraisal of options, and making, implementing, and reviewing decisions to reduce, control, accept, or redistribute risks of flooding. Integrated flood risk management explicitly recognizes the interrelationships between all risk management measures, and their analysis, costs, and effectiveness, within changing social, economic, and environmental contexts. It can be helped by improving access to data and models, sharing and communicating risk analyses, involving a wider range of stakeholders, and coordinating risk management actions. Flood risk management in England and Wales is rapidly changing. This paper explains these changes in terms of their contribution to integrated flood risk management and describes further developments that are required to enable the difficult task of integrated flood risk management to be realized in practice.
dc.publisherAmerican Society of Civil Engineers
dc.titleIntegrated Flood Risk Management in England and Wales
dc.typeJournal Paper
dc.journal.volume4
dc.journal.issue3
dc.journal.titleNatural Hazards Review
dc.identifier.doi10.1061/(ASCE)1527-6988(2003)4:3(126)
dc.treeNatural Hazards Review:;2003:;Volume ( 004 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record