Show simple item record

dc.contributor.authorE.-E. Chang
dc.contributor.authorYi-Li Lin
dc.contributor.authorPen-Chi Chiang
dc.date.accessioned2017-05-08T21:30:03Z
dc.date.available2017-05-08T21:30:03Z
dc.date.copyrightJanuary 2007
dc.date.issued2007
dc.identifier.other%28asce%291090-025x%282007%2911%3A1%282%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/53855
dc.description.abstractIn accordance with the source water implementation plan rule (SWIPR) in Taiwan, water treatment plants (WTPs) with source water parameters exceeding the source water quality standards are required to submit a source water implementation plan to improve the source water and drinking water quality. In this study, the SWIPR was analyzed, and the concept of comprehensive performance evaluation (CPE) was applied for upgrading the performance of WTPs. Three WTPs [Da-Nan WTP (Type 1), Liu-Du WTP (Type 2), and Chen-Chin-Lake WTP (Type 3)] were selected as demonstration projects. A CPE team was established to evaluate the operations of these WTPs and make recommendations for improving the performance of the WTPs to achieve the drinking water standards. This paper describes the analysis and recommendations of the CPE team.
dc.publisherAmerican Society of Civil Engineers
dc.titleEstablishment and Implementation of Source Water Implementation Plan for Water Treatment Plants in Taiwan
dc.typeJournal Paper
dc.journal.volume11
dc.journal.issue1
dc.journal.titlePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management
dc.identifier.doi10.1061/(ASCE)1090-025X(2007)11:1(2)
dc.treePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;2007:;Volume ( 011 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record