Show simple item record

dc.contributor.authorKimberly Davis, P.E.
dc.contributor.authorChris Bolton
dc.date.accessioned2017-05-08T21:29:40Z
dc.date.available2017-05-08T21:29:40Z
dc.date.copyrightApril 1999
dc.date.issued1999
dc.identifier.other%28asce%291090-025x%281999%293%3A2%2894%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/53595
dc.description.abstractIn 1995, the Tennessee Department of Environment and Conservation (TDEC) implemented a new ranking system for sites to assign a level of risk and associated cleanup recommendations. This ranking system, which scores sites based on 15 ranking score parameters, is one way in which TDEC is using risk-based corrective action (RBCA). University of Tennessee researchers are following the reported costs of managing a group of 341 sites and examining the impact of these parameters, particularly the coefficient of permeability, on determining the risk and the recommended cleanup method for the site. Also, the writers assess RBCA's overall contribution to cost reduction of underground site management.
dc.publisherAmerican Society of Civil Engineers
dc.titleReducing Costs of UST Site Management Using RBCA Strategy
dc.typeJournal Paper
dc.journal.volume3
dc.journal.issue2
dc.journal.titlePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management
dc.identifier.doi10.1061/(ASCE)1090-025X(1999)3:2(94)
dc.treePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;1999:;Volume ( 003 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record