Show simple item record

dc.contributor.authorKent A. Harries
dc.date.accessioned2017-05-08T21:25:51Z
dc.date.available2017-05-08T21:25:51Z
dc.date.copyrightMarch 2009
dc.date.issued2009
dc.identifier.other%28asce%291084-0702%282009%2914%3A2%2878%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/51181
dc.description.abstractOn the evening of December 27, 2005, the fascia beam supporting the east-side parapet wall of the third span of the Lake View Drive Bridge failed under the action of dead load. This paper describes the structural testing and posttest forensic examination of two girders recovered from the partially collapsed Lake View Drive Bridge. The objective of this paper is to describe the tests conducted and report the observations. An interior and an exterior prestressed concrete adjacent box girder were tested to failure in flexure. Prior to testing, an extensive visual inspection was conducted to assess the extant condition of the
dc.publisherAmerican Society of Civil Engineers
dc.titleStructural Testing of Prestressed Concrete Girders from the Lake View Drive Bridge
dc.typeJournal Paper
dc.journal.volume14
dc.journal.issue2
dc.journal.titleJournal of Bridge Engineering
dc.identifier.doi10.1061/(ASCE)1084-0702(2009)14:2(78)
dc.treeJournal of Bridge Engineering:;2009:;Volume ( 014 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record