Show simple item record

dc.contributor.authorJohn C. Wilson
dc.contributor.authorKeith Holmes
dc.date.accessioned2017-05-08T21:25:36Z
dc.date.available2017-05-08T21:25:36Z
dc.date.copyrightMay 2007
dc.date.issued2007
dc.identifier.other%28asce%291084-0702%282007%2912%3A3%28364%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/51026
dc.description.abstractThe implications of earthquake loading during balanced cantilever construction of a cable-stayed bridge are examined. Finite-element models of a cable-stayed bridge were developed and multiple ground motion time history records were used to study the seismic response at the base of the towers for six stages of balanced cantilever construction. Probabilistic seismic hazard relationships were used to relate ground motions to bridge responses. The results show that there can be a high probability of having seismic responses (forces/moments) in a partially completed bridge that exceed, often by a substantial margin, the
dc.publisherAmerican Society of Civil Engineers
dc.titleSeismic Vulnerability and Mitigation during Construction of Cable-Stayed Bridges
dc.typeJournal Paper
dc.journal.volume12
dc.journal.issue3
dc.journal.titleJournal of Bridge Engineering
dc.identifier.doi10.1061/(ASCE)1084-0702(2007)12:3(364)
dc.treeJournal of Bridge Engineering:;2007:;Volume ( 012 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record