Show simple item record

dc.contributor.authorB. W. Chavel
dc.contributor.authorC. J. Earls
dc.date.accessioned2017-05-08T21:25:27Z
dc.date.available2017-05-08T21:25:27Z
dc.date.copyrightJanuary 2006
dc.date.issued2006
dc.identifier.other%28asce%291084-0702%282006%2911%3A1%2891%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/50899
dc.description.abstractThe erection of horizontally curved steel I-girder bridges tends to be more complex than the erection of straight steel I-girder bridges. The erection of a curved steel I-girder bridge can be further complicated when the cross-frame members and girders are detailed inconsistently in an effort to force bridge components into some desirable geometric condition. Inconsistent detailing involves the intentional specification of cross-frame members that are either too long or too short to align with girder connector plates properly so as to force the girders into a given position, resulting in connection misalignments that must be resolved by applying external forces to the bridge components. The current research investigates the erection of a recently constructed horizontally curved steel I-girder bridge and highlights the fact that practice of inconsistent detailing can lead to very formidable and costly fit-up problems in the field; especially when girder sizes are large.
dc.publisherAmerican Society of Civil Engineers
dc.titleConstruction of a Horizontally Curved Steel I-Girder Bridge. Part II: Inconsistent Detailing
dc.typeJournal Paper
dc.journal.volume11
dc.journal.issue1
dc.journal.titleJournal of Bridge Engineering
dc.identifier.doi10.1061/(ASCE)1084-0702(2006)11:1(91)
dc.treeJournal of Bridge Engineering:;2006:;Volume ( 011 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record