| dc.description.abstract | The erection of horizontally curved steel I-girder bridges tends to be more complex than the erection of straight steel I-girder bridges. The erection of a curved steel I-girder bridge can be further complicated when the cross-frame members and girders are detailed inconsistently in an effort to force bridge components into some desirable geometric condition. Inconsistent detailing involves the intentional specification of cross-frame members that are either too long or too short to align with girder connector plates properly so as to force the girders into a given position, resulting in connection misalignments that must be resolved by applying external forces to the bridge components. The current research investigates the erection of a recently constructed horizontally curved steel I-girder bridge and highlights the fact that practice of inconsistent detailing can lead to very formidable and costly fit-up problems in the field; especially when girder sizes are large. | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Construction of a Horizontally Curved Steel I-Girder Bridge. Part II: Inconsistent Detailing | |
| dc.type | Journal Paper | |
| dc.journal.volume | 11 | |
| dc.journal.issue | 1 | |
| dc.journal.title | Journal of Bridge Engineering | |
| dc.identifier.doi | 10.1061/(ASCE)1084-0702(2006)11:1(91) | |
| dc.tree | Journal of Bridge Engineering:;2006:;Volume ( 011 ):;issue: 001 | |
| dc.contenttype | Fulltext | |