• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Effect of Common Cause Failures on Indirect Costs

    Thumbnail
    View/Open
    %28asce%291084-0702%282004%299%3A2%28200%29.pdf (707.3Kb)
    Date
    2004
    Author
    Bryan Adey
    Rade Hajdin
    Eugen Brühwiler
    Metadata
    Show full item record
    Abstract
    Next generation bridge management systems will take into consideration multiple hazard scenarios and not only traffic loading and structural deterioration as they do now. The indirect costs used in these bridge management systems to determine optimal management strategies vary according to the hazard scenarios considered. The difference depends on whether or not the bridge failures are due to a common cause, such as a single flood or earthquake, or due to load events that may be considered statistically unrelated, such as truck loads. To illustrate the effect of common cause bridge failures on indirect costs, two examples are presented that treat the failures first as if they are due to statistically independent loading events and then as if they are due to a common cause. To examine the effect of bridge failures on indirect costs of the system, estimation is performed at the network level. The first example, on a simple network, shows the indirect cost estimate for all of the network condition states. The second example, on a complex network, shows the difference in the possible reduction of total indirect costs with a single bridge intervention as well as the change in intervention sequence. The main conclusions are that total indirect costs and optimal intervention sequences differ depending on whether or not bridge failures are due to a common cause, and that the largest changes in indirect cost estimation occur when simultaneously failed bridges affect the method of indirect cost incurrence.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/50736
    Collections
    • Journal of Bridge Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV