Show simple item record

dc.contributor.authorZhong Liu
dc.contributor.authorFang Li
dc.contributor.authorW. M. Kim Roddis
dc.date.accessioned2017-05-08T21:24:59Z
dc.date.available2017-05-08T21:24:59Z
dc.date.copyrightJanuary 2002
dc.date.issued2002
dc.identifier.other%28asce%291084-0702%282002%297%3A1%2814%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/50602
dc.description.abstractAn innovative self-shoring staged construction method was developed to build the world’s longest reinforced composite concrete arch bridge across the Yangtze River at Wanxian, in Chongqing, China. The method uses a steel tube truss frame constructed by the conventional cantilever launching technique. This steel frame with concrete-filled tubes performs the dual role of arch falsework and arch main reinforcement for the final reinforced concrete arch bridge. An optimized schedule for concrete placement was proposed to control the stresses, deflections, and stability of the arch rib during construction. The time dependent effects of concrete, the nonlinear stress-strain relationship of steel and concrete, as well as the geometric nonlinearility were considered. Control information at various stages of construction can be provided using the model developed. A program was developed to conduct parametric studies for selection of the final construction scheme and to direct the construction progress by monitoring and comparing actual and predicted stress and deflection.
dc.publisherAmerican Society of Civil Engineers
dc.titleAnalytic Model of Long-Span Self-Shored Arch Bridge
dc.typeJournal Paper
dc.journal.volume7
dc.journal.issue1
dc.journal.titleJournal of Bridge Engineering
dc.identifier.doi10.1061/(ASCE)1084-0702(2002)7:1(14)
dc.treeJournal of Bridge Engineering:;2002:;Volume ( 007 ):;issue: 001
dc.contenttypeFulltext