• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Optimization of HPS 70W Applications

    Thumbnail
    View/Open
    %28asce%291084-0702%282002%297%3A1%281%29.pdf (250.7Kb)
    Date
    2002
    Author
    Edward P. Wasserman
    Metadata
    Show full item record
    Abstract
    In February 1996 the Tennessee Department of Transportation, in cooperation with the Federal Highway Administration, the American Iron and Steel Institute, the U.S. Navy, and various steel plate manufacturers, agreed to design the first bridge in the United States to use HPS 485W (70W) steel. Since that time the department has constructed a second bridge using HPS 485W (70W) and has let to contract a third bridge that uses HPS 485W (70W) in both quenched and tempered and thermomechanical controlled processing HPS 485W (70W) steel. This paper will discuss lessons learned in the process and present optimization techniques employed.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/50601
    Collections
    • Journal of Bridge Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV