• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Bearing Replacement for Prestressed Concrete I-Girder Bridges

    Thumbnail
    View/Open
    %28asce%291084-0702%282001%296%3A4%28271%29.pdf (246.5Kb)
    Date
    2001
    Author
    Sun-Kyu Park
    Hyeong-Yeol Kim
    Jung-Hyuk Kim
    Metadata
    Show full item record
    Abstract
    This paper deals with the jacking procedure for the replacement of prestressed concrete I-girder bearings, without damaging the superstructure. The finite-element method-based analysis procedure to compute the jacking force and overall jacking sequence for the girders is proposed. The proposed method takes into account the stress concentration at the loaded area on the girder and the behavior of superstructure due to the jacking force. An analytical equation is proposed to compute the allowable jacking force considering the bursting stress induced at the loaded area on the girder. On the other hand, the overall jacking sequence to lift the superstructure for the bearing replacement is determined by considering the response of the superstructure being jacked. This paper also includes an illustrative example of a jacking procedure for a prototype prestressed concrete I-girder bridge.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/50554
    Collections
    • Journal of Bridge Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV