Show simple item record

dc.contributor.authorR. Richard Avent
dc.contributor.authorDavid J. Mukai
dc.date.accessioned2017-05-08T21:24:52Z
dc.date.available2017-05-08T21:24:52Z
dc.date.copyrightApril 2001
dc.date.issued2001
dc.identifier.other%28asce%291084-0702%282001%296%3A2%2895%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/50536
dc.description.abstractThe goal of this study was twofold: (1) To demonstrate that engineered heat straightening is a viable alternative for the repair of damaged steel bridge girders; and (2) to illustrate how the latest results of research and development can be implemented for heat-straightening repairs. The bridge chosen for repair crosses over I-10 in Louisiana, just east of Lake Charles. Working with personnel from the Louisiana Department of Transportation and Development, the bridge was repaired during August 1998. A fascia noncomposite beam had been impacted, and the bottom flange was displaced 0.43 m (17 in.). The repair was designed by the writers and implemented in conjunction with Louisiana Department of Transportation and Development personnel. Described in this paper are the design of the repair, including assessment of damage, selection of heating patterns, development of jacking restraint locations and magnitudes, and heating sequences; the step-by-step implementation; a cost comparison; and a discussion of lessons learned. It is concluded that heat straightening is an effective alternative for repairing damaged steel bridges, when implemented with proper engineering design.
dc.publisherAmerican Society of Civil Engineers
dc.titleEngineered Heat-Straightening Repairs: A Case Study
dc.typeJournal Paper
dc.journal.volume6
dc.journal.issue2
dc.journal.titleJournal of Bridge Engineering
dc.identifier.doi10.1061/(ASCE)1084-0702(2001)6:2(95)
dc.treeJournal of Bridge Engineering:;2001:;Volume ( 006 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record