Show simple item record

dc.contributor.authorAngel C. Aparicio
dc.contributor.authorGonzalo Ramos
dc.contributor.authorJuan R. Casas
dc.date.accessioned2017-05-08T21:24:48Z
dc.date.available2017-05-08T21:24:48Z
dc.date.copyrightNovember 2000
dc.date.issued2000
dc.identifier.other%28asce%291084-0702%282000%295%3A4%28337%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/50512
dc.description.abstractThis paper presents an externally prestressed high strength concrete viaduct designed and erected in Spain. This viaduct, a three-span (41 + 50 + 41 m) continuous beam, has been designed and built with a 60-MPa strength concrete and a fully external replaceable prestressing. The paper describes the bridge, the erection procedure, the ultimate analysis performed with a nonlinear finite-element numerical model, and the thermal stresses measured and calculated at the anchorage diaphragms due to the hydration heat of the concrete. The results of the static tests carried out on the bridge also are commented upon.
dc.publisherAmerican Society of Civil Engineers
dc.titleExternally Prestressed High Strength Concrete Viaduct
dc.typeJournal Paper
dc.journal.volume5
dc.journal.issue4
dc.journal.titleJournal of Bridge Engineering
dc.identifier.doi10.1061/(ASCE)1084-0702(2000)5:4(337)
dc.treeJournal of Bridge Engineering:;2000:;Volume ( 005 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record