Show simple item record

dc.contributor.authorMiguel A. Astiz
dc.date.accessioned2017-05-08T21:24:41Z
dc.date.available2017-05-08T21:24:41Z
dc.date.copyrightAugust 1998
dc.date.issued1998
dc.identifier.other%28asce%291084-0702%281998%293%3A3%28132%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/50402
dc.description.abstractAs longer suspension bridges are being built and planned around the world, many feasibility problems arise. Experiences related with preliminary studies on the Gibraltar Bridge are presented. Flutter is considered to be the main feasibility problem for a very-long-span bridge, and it is analyzed in this paper for span lengths ranging from 1,600 to 6,000 m. As conventional deck designs present unacceptably low critical velocities, several alternative suspension schemes are analyzed to determine their qualities to prevent flutter instability. These systems use a variable number of main cables (from one to four) and hangers arranged in such a way as to produce the highest stiffening effects on the statical system. Flutter is analyzed by means of a multimodal finite-element-based method, and critical conditions are defined by observation of the
dc.publisherAmerican Society of Civil Engineers
dc.titleFlutter Stability of Very Long Suspension Bridges
dc.typeJournal Paper
dc.journal.volume3
dc.journal.issue3
dc.journal.titleJournal of Bridge Engineering
dc.identifier.doi10.1061/(ASCE)1084-0702(1998)3:3(132)
dc.treeJournal of Bridge Engineering:;1998:;Volume ( 003 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record