• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Predictability of Annual Sediment Loads Based on Flood Events

    Thumbnail
    View/Open
    %28asce%291084-0699%282006%2911%3A4%28354%29.pdf (179.3Kb)
    Date
    2006
    Author
    Momcilo Markus
    Misganaw Demissie
    Metadata
    Show full item record
    Abstract
    Water resources managers always are searching for cost-effective monitoring programs that provide maximum information for minimum cost. Monitoring of sediment discharges from streams and rivers is one of the expensive efforts that is always reduced or cut when financial resources are limited. This has resulted in a very limited number of long-term sediment monitoring sites in the United States. Instead of long-term continuous monitoring programs, alternative monitoring approaches could potentially provide reliable estimates of sediment loads at reduced cost. One of those approaches is monitoring sediment loads during flood events and then using that information to estimate annual sediment loads. To test this approach, annual suspended sediment loads calculated based on continuous sediment monitoring were compared with the loads calculated based on monitoring the major floods only. Streams transport large percentages of the annual sediment loads from a watershed during a small number of floods that occur over relatively short time periods in a year. It was found that in Illinois, on average, the single highest, two highest, three highest, and four highest floods in a year transport 32, 49, 61, and 68% of the annual load, respectively. Consequently, the annual sediment loads were correlated highly with sediment transported during the highest floods. Thus, annual sediment loads can be predicted based on the sediment data during the highest floods. The predictions were tested on 27 small and medium streams in Illinois, for the period 1977–2000. The median error for predicting the annual load ranged from 42% for the single highest flood to 16% for the four highest floods. When resources are limited and the main purpose of the monitoring is estimation of annual sediment loads, a monitoring program based on flood events represents a more economical option.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/49958
    Collections
    • Journal of Hydrologic Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV