Show simple item record

dc.contributor.authorAsif Quader
dc.contributor.authorYiping Guo
dc.date.accessioned2017-05-08T21:23:55Z
dc.date.available2017-05-08T21:23:55Z
dc.date.copyrightJanuary 2006
dc.date.issued2006
dc.identifier.other%28asce%291084-0699%282006%2911%3A1%2846%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/49910
dc.description.abstractThe recently developed analytical probabilistic approach was used for estimation of peak discharge rates in a practical design case. The results were compared with those from the commonly used design storm approach. Differences in meteorological data analysis and representation of rainfall input, subcatchment aggregation, and the treatment of the catchment time of concentration between the two approaches were identified as the three main causes contributing to the discrepancy in peak discharge estimates. In spite of the differences, peak discharge estimates from the two approaches are generally comparable for the actual design case. Furthermore, this study revealed that discrepancies caused by subcatchment aggregation and the difference in meteorological data analysis are approximately the same. Treating the time of concentration as a constant across storms of various magnitudes was found not to contribute to a large discrepancy. However, it was shown that the closer the time of concentration values used in the two approaches, the closer the resultant peak discharge estimates.
dc.publisherAmerican Society of Civil Engineers
dc.titlePeak Discharge Estimation Using Analytical Probabilistic and Design Storm Approaches
dc.typeJournal Paper
dc.journal.volume11
dc.journal.issue1
dc.journal.titleJournal of Hydrologic Engineering
dc.identifier.doi10.1061/(ASCE)1084-0699(2006)11:1(46)
dc.treeJournal of Hydrologic Engineering:;2006:;Volume ( 011 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record