| dc.contributor.author | Richard H. McCuen | |
| dc.date.accessioned | 2017-05-08T21:23:49Z | |
| dc.date.available | 2017-05-08T21:23:49Z | |
| dc.date.copyright | January 2005 | |
| dc.date.issued | 2005 | |
| dc.identifier.other | %28asce%291084-0699%282005%2910%3A1%2816%29.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl/handle/yetl/49831 | |
| dc.description.abstract | Goodness-of-fit statistics that accompany model calibration may not be good indicators of prediction accuracy. The difference between model calibration and validation accuracy has not been studied under the assumption that they are similar. Two methods of assessing prediction accuracy are compared. Split-sample testing and jackknifing are evaluated as a function of the sample size, the number of predictor variables, and the calibration accuracy. The relationship of split-sample testing is very sensitive to the sample size and the level of calibration accuracy. For small samples, split-sample testing is quite poor because of the loss of accuracy when the sample size is halved. The prediction accuracy decreases as the number of predictors increases because of the loss of degrees of freedom. Applications to regression analyses for a 10-year peak discharge prediction are provided. The results of an application to measured peak discharge data agree with simulation results. Future peak discharge studies should report both the calibration and jackknifing goodness-of-fit statistics. | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Accuracy Assessment of Peak Discharge Models | |
| dc.type | Journal Paper | |
| dc.journal.volume | 10 | |
| dc.journal.issue | 1 | |
| dc.journal.title | Journal of Hydrologic Engineering | |
| dc.identifier.doi | 10.1061/(ASCE)1084-0699(2005)10:1(16) | |
| dc.tree | Journal of Hydrologic Engineering:;2005:;Volume ( 010 ):;issue: 001 | |
| dc.contenttype | Fulltext | |