Show simple item record

dc.contributor.authorM. L. Anderson
dc.contributor.authorZ.-Q. Chen
dc.contributor.authorM. L. Kavvas
dc.contributor.authorArlen Feldman
dc.date.accessioned2017-05-08T21:23:34Z
dc.date.available2017-05-08T21:23:34Z
dc.date.copyrightJuly 2002
dc.date.issued2002
dc.identifier.other%28asce%291084-0699%282002%297%3A4%28312%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/49667
dc.description.abstractThe operation of reservoirs in the Sierra Nevada mountains of California for flood control relies on forecasts of reservoir inflows. In the past, accurate forecasts of the reservoir inflows resulting from watershed runoff have been made, but only after the water has entered the main channel. During flooding events, this limits the amount of time available for the implementation of emergency management procedures. Translating precipitation forecasts into runoff forecasts can greatly improve the runoff-forecast lead time. The operational National Center for Environmental Prediction Eta model provides 48-h-ahead forecasts of precipitation in 6-h intervals in a
dc.publisherAmerican Society of Civil Engineers
dc.titleCoupling HEC-HMS with Atmospheric Models for Prediction of Watershed Runoff
dc.typeJournal Paper
dc.journal.volume7
dc.journal.issue4
dc.journal.titleJournal of Hydrologic Engineering
dc.identifier.doi10.1061/(ASCE)1084-0699(2002)7:4(312)
dc.treeJournal of Hydrologic Engineering:;2002:;Volume ( 007 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record