Show simple item record

dc.contributor.authorLawrence A. J. Fennessey
dc.contributor.authorJames M. Hamlett
dc.contributor.authorGert Aron
dc.contributor.authorDavid LaSota
dc.date.accessioned2017-05-08T21:23:28Z
dc.date.available2017-05-08T21:23:28Z
dc.date.copyrightAugust 2001
dc.date.issued2001
dc.identifier.other%28asce%291084-0699%282001%296%3A4%28317%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/49595
dc.description.abstractA continuous simulation stormwater management model (with 33 years of historical precipitation) was used to determine how the design criteria from five different stormwater management pond ordinances changed the runoff from a 7.77 ha watershed following a hypothetical development scenario. All five evaluated ordinances required that the postdevelopment runoff rates from the site be less than or equal to the predevelopment runoff rates for each return period (a zero increase criteria). However, none of the five ordinances were effective at limiting the increase in runoff peak rates for the 1- and 2-year return periods for the annual runoff series, the 1-year return period for the annual exceedance (partial) runoff series duration, or more frequent precipitation events. To better control the lower frequency runoff events from stormwater ponds, the 1- and 2-year return periods should always be analyzed for a basin's design. Additionally, there was a radical change in the frequency of small and moderate runoff events occurring from the watershed following the hypothetical development.
dc.publisherAmerican Society of Civil Engineers
dc.titleChanges in Runoff due to Stormwater Management Pond Regulations
dc.typeJournal Paper
dc.journal.volume6
dc.journal.issue4
dc.journal.titleJournal of Hydrologic Engineering
dc.identifier.doi10.1061/(ASCE)1084-0699(2001)6:4(317)
dc.treeJournal of Hydrologic Engineering:;2001:;Volume ( 006 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record