Show simple item record

dc.contributor.authorBenjamin Levy
dc.contributor.authorRichard McCuen
dc.date.accessioned2017-05-08T21:23:15Z
dc.date.available2017-05-08T21:23:15Z
dc.date.copyrightJuly 1999
dc.date.issued1999
dc.identifier.other%28asce%291084-0699%281999%294%3A3%28209%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/49462
dc.description.abstractAppropriately designed flood control infrastructure should provide for public safety without wasteful over-design. The design-storm duration is a very significant determinant of the computed peak discharge. Presently, most hydrologic design is based on either the 24-h storm duration or a duration equal to the time of concentration. The professional literature, however, has not included a rational basis for using either of these durations. Since the annual maximum discharges are the basis for flood frequency analyses and ultimately flood risk estimates, it is reasonable that the rainfall duration that causes the annual maximum discharge should provide insight into the most appropriate duration for design storms. Use of the time of concentration suggests that the duration should depend on drainage area. Therefore, a range of watershed areas were used to determine whether or not storm duration depends on watershed size. Analysis of annual maximum discharge data for six Maryland watersheds (1.97 ≤
dc.publisherAmerican Society of Civil Engineers
dc.titleAssessment of Storm Duration for Hydrologic Design
dc.typeJournal Paper
dc.journal.volume4
dc.journal.issue3
dc.journal.titleJournal of Hydrologic Engineering
dc.identifier.doi10.1061/(ASCE)1084-0699(1999)4:3(209)
dc.treeJournal of Hydrologic Engineering:;1999:;Volume ( 004 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record