• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Causes of Delay in the Planning and Design Phases for Construction Projects

    Thumbnail
    View/Open
    %28asce%291076-0431%282010%2916%3A2%2880%29.pdf (75.27Kb)
    Date
    2010
    Author
    Jyh-Bin Yang
    Pei-Rei Wei
    Metadata
    Show full item record
    Abstract
    Problems of delay occur in all phases of construction projects. While most previous studies have focused on finding causes or overcoming delays in the construction phase, few studies have analyzed delay problems in the planning and design phases. The main purpose of this study is to identify and rank delay causes in the planning and design phases. A structured questionnaire was sent to engineers at the A/E companies for public construction projects in Taiwan. Based on 95 valid responses, this study identified the delay causes and analyzed the importance and frequency of delays using the relative importance index. Analytical results reveal that “changes in client’s requirement” are the main causes of delays in both planning and design phases. The finding is good justification for many public clients who usually change their requirements during the planning and design phases that really delay construction projects.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/48839
    Collections
    • Journal of Architectural Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV