dc.contributor.authorSinem Korkmaz
dc.contributor.authorJohn I. Messner
dc.contributor.authorDavid R. Riley
dc.contributor.authorChristopher Magent
dc.date.accessioned2017-05-08T21:22:19Z
dc.date.available2017-05-08T21:22:19Z
dc.date.copyrightMarch 2010
dc.date.issued2010
dc.identifier.other%28asce%291076-0431%282010%2916%3A1%2837%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/48835
dc.description.abstractHigh-performance green buildings require close integration of building systems with a special focus on energy, daylighting, and material analysis during their design processes. Design process modeling and use of visualization tools can facilitate better communication and collaboration between team members; hence better integration in the design process. This paper presents a case study of the integrated design process of an Early Childhood Learning Center as performed by a team of university students and faculty. A process modeling approach of key decisions, required consultants, and virtual prototypes of the building was used during the design development stages of the case study. This case illustrates the use of process modeling and visualization tools to provide an accurate building information system for integrated teams. Through this experience, process modeling and visualization tools were found to be useful mechanisms to achieve high performance design goals and minimize design process waste.
dc.publisherAmerican Society of Civil Engineers
dc.titleHigh-Performance Green Building Design Process Modeling and Integrated Use of Visualization Tools
dc.typeJournal Paper
dc.journal.volume16
dc.journal.issue1
dc.journal.titleJournal of Architectural Engineering
dc.identifier.doi10.1061/(ASCE)1076-0431(2010)16:1(37)
dc.treeJournal of Architectural Engineering:;2010:;Volume ( 016 ):;issue: 001
dc.contenttypeFulltext